
After a 2-week-break to let the 'crete dry, we restarted building today. And we got a big digger (from Manfred Winter) to build up a solid wall for the missing plattform.

Thanks a lot to Hermann Maier from Gemeinde Radstadt for doing an awesome job! And thanks again to Herbert Heigl as well as Reiter Erdbau for supplying us with material!