a fast day of diggin'


Wow, what a day. Thanks to my man Fritz aka. Bagger Freak we had a big day today. 12h diggin' on site, and it was totally worth it – the first time the construction site looks like a project, not a flat space!


We managed to get down the basic shape of the mould (or bowl - whatever suits you better) and if everything works in that pace – fair enough ;-)


And thanks a load to Jürgen Grüßer for helping us up with the digger (not even mentioning the free Diesel here!) and Christian Ebner from Bauhof Radstadt for his support – very important helping hand!